This is our final product. A 2 minute opening sequence for our film, A Sight For Sore Eyes.
Here is my Music Video:
Here is the outside panel for my digipak:
Here is the inside panel of my digipak:
Wednesday, 1 March 2017
Construction Post 26: Reflections on Edit Week 2
I think our edit week 2 went really well, even better than edit week 1. We successfully added the new footage from our back up shoot, and added the finishing touches to the sequence such as grading and sound mixing. Grading was my favourite part of the post production because I found three-way colour correcter really interesting and fun to use. We had to make a lot of our shots less yellow and I think we pulled it off quite well.
Labels:
AS Coursework
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment